February

Total Time: 3h0m0s


The month of February 2022 is the month the actual build began. Time not included here is getting the shop set back up. Most of my tools, shelves, etc. were moved to the hangar to finish the Zenith CH-750 Cruzer build. We were anxious to get started so we took the slower, but immediate gratification route, of moving only the base tools necessary from the hangar to the garage and piling them in a corner :-/. As we needed a tool, we used it, then put it back in a better place. If we didn't have the tool in the garage, we made another trip to the hangar bringing back another load of tools.